You're Switching from Jobber.
Here's Why Stamped Concrete Choose Nexa.

Jobber
$69/mo
$828/year — every year, forever
Nexa
$279
Once. Own it forever.
or 3 payments of $99
Break even in 4.0 months. Then it's free forever.
"Switched from Jobber after the last price increase. Nexa does everything I needed for $279. Wish I'd done it sooner."
— Verified stamped concrete contractor, former Jobber customer

The Bottom Line

Stamped Concrete on Jobber pay $69/month — $828/year. Over three years, that's $2,778. Nexa is $279 once. Break-even runs about 4.0 months. The median stamped concrete contractor earns $55,000/year, so Jobber's annual cost is roughly 1.5% of typical revenue — every year, forever.

Key Numbers

$55,000
Median stamped concrete contractor income
3%
Typical SaaS spend as % of revenue
4.0 mo
Break-even vs Jobber
$2,499
3-year savings switching to Nexa

What Jobber Is Costing You

The Damage

Jobber monthly $69/mo
Annual drain $828/yr
Year 2 (11.4% SaaS inflation) $922
Year 3 $1,028
3-year total $2,778

That's $2,778 gone. And you don't own anything. Stop paying, lose access.

Your Jobber subscription has cost you $0.00 since you opened this page.

Why Stamped Concrete Leave Jobber

✗Per-user pricing scales expensively ($29/user/month)
✗Marketing Suite is extra $79/month on lower tiers
✗Job costing only on Grow plan
✗Expense tracking locked to higher tiers
✗Real cost often $300-600/month for small teams
✗I recently canceled two subscriptions. HouseCall Pro is far superior. This company held me hostage for $8,250 for seven days claiming it was my first
✗Jobber is an overengineered platform that still lacks basic functionality. Confirmation emails cannot include a clear list of services being provided.
✗Their pricing could use some help. Features locked to higher tier should be included as default.
Stamped Concrete are leaving Jobber every week.

You're not the only one who's had enough.

Why This Matters for Stamped Concrete

Stamped concrete is a race against the slab's own clock. The pour goes down early, and from that moment you're reading the surface: bull-float it, broadcast color hardener, work it in, and then wait for the exact window when the concrete is firm enough to hold a sharp stamp impression but still plastic enough to take it. Miss it early and the stamps sink and slur; miss it late and they barely register and you're fighting a slab that's flashed off. When the window opens it's all hands, dusting on the antiquing release powder for color depth, laying the stamp mats in sequence, and tamping each one so the texture transfers evenly, working fast across the whole slab before any section sets. Weather is merciless: a hot, windy day flashes the surface and shrinks your window to minutes, and a surprise shower on a fresh stamp is a disaster with no undo. The next day you pressure-wash the excess release, touch up the joints with hand tools, and roll on cure-and-seal. Customers hold up the catalog photo expecting flawless flagstone, and you explain that concrete cracks, that's why you cut control joints, and a hairline at the joint isn't a defect. You finish sealing and taping it off, because a footprint in fresh sealer is the one thing you can't buff out.

Stamped Concrete face unique challenges: Timing the stamp to the exact window when the slab is firm enough to hold a print but soft enough to take it before it flashes off. Weather working against the pour, heat flashing the surface too fast or rain ruining a fresh stamp with no do-over. Color consistency across batches and getting the antiquing release to read even instead of blotchy. Customers expecting the catalog photo on a slab that cracks at the control joints like all concrete eventually does. On top of all that, Jobber charges $69/month ($828/year) — money that comes directly from your revenue. The median stamped concrete contractor earns $55,000/year. Software at $828/year is a meaningful percentage of that income, every year, forever. And you do not own anything.

Your concrete stamp mats and texture skins is yours. You bought it once. Nexa works the same way — $279 once for invoicing, scheduling, CRM, time tracking, and full accounting. All connected. All offline-capable. You own it like you own your tools.

Your Full Stack Cost

Jobber is just one piece. What else are you losing money on?

Want this breakdown emailed to you?

Your exact Jobber cost, full stack total, and what switching saves. 10 seconds.

"I was paying Jobber $69/month and didn't question it until I did the math. $2,778 over 3 years for tools I don't even own. Nexa was $279. Once. Done."
— Stamped concrete contractor business owner

What You Get Instead

Feature Jobber Nexa
Invoicing ✓ ✓
Scheduling ✗ ✓
CRM ✗ ✓
Time Tracking ✗ ✓
Full Accounting ✗ ✓ (SIMPL)
Task Management ✗ ✓
Price $69/mo forever $279 once
or 3 × $99
3-Year Cost $2,778 $279
Stop paying? Lose everything Keep everything forever

Switching Takes 1-2 Days

Most stamped concrete are fully switched before the weekend.

1

Export your data

Go to Settings → Data Export. Download clients, jobs, and invoices as CSV.

2

Set up Nexa

15-minute setup. Import your client list and job categories.

3

Parallel run

Run both for 1-2 weeks to verify scheduled jobs transfer cleanly.

4

Cancel Jobber

Cancel subscription before your next billing cycle. Download final export.

✓ Run both in parallel. Cancel Jobber when you're confident. Zero risk.

What stamped concrete actually deal with

A day in the life of a stamped concrete contractor

Stamped concrete is a race against the slab's own clock. The pour goes down early, and from that moment you're reading the surface: bull-float it, broadcast color hardener, work it in, and then wait for the exact window when the concrete is firm enough to hold a sharp stamp impression but still plastic enough to take it. Miss it early and the stamps sink and slur; miss it late and they barely register and you're fighting a slab that's flashed off. When the window opens it's all hands, dusting on the antiquing release powder for color depth, laying the stamp mats in sequence, and tamping each one so the texture transfers evenly, working fast across the whole slab before any section sets. Weather is merciless: a hot, windy day flashes the surface and shrinks your window to minutes, and a surprise shower on a fresh stamp is a disaster with no undo. The next day you pressure-wash the excess release, touch up the joints with hand tools, and roll on cure-and-seal. Customers hold up the catalog photo expecting flawless flagstone, and you explain that concrete cracks, that's why you cut control joints, and a hairline at the joint isn't a defect. You finish sealing and taping it off, because a footprint in fresh sealer is the one thing you can't buff out.

The tools a working stamped concrete contractor actually owns

Local stamped concrete on Nexa

Real stamped concrete near you who run their business on Nexa — book directly, no platform fee. Are you a stamped concrete contractor? Post your business and get found in your area — $2.99 one-time. Or browse every stamped concrete contractor on Nexa →

FAQ

Is Nexa really a Jobber replacement for stamped concrete?

For solo operators and small teams (1-5), yes. Nexa includes invoicing, scheduling, CRM, time tracking, task management, and full accounting. Jobber may be better if you have a large team (10+) or need enterprise-specific features.

$279 seems like a lot.

It's $7.75/month over 3 years. Jobber is $69/month — that's $2,778 over 3 years. Which is more? And if you'd rather split it, Nexa is also available as 3 payments of $99.

Can I pay in installments?

Yes. Nexa is $279 as a one-time payment, or 3 payments of $99 ($297 total). Either way it's a one-time purchase — no subscription, no recurring fees ever.

What if I don't like it?

30-day money-back guarantee. Full refund. If Nexa doesn't save you $500 in year one, you get every penny back.

Can I import my Jobber data?

Export your data from Jobber as CSV, import into Nexa in about 5 minutes.

Stamped Concrete in Nashville

The average solo operator there spends about $2,200/year on software — and stamped concrete contractor face their own version of that math. Tennessee has no state income tax as of 2021. No city income tax in Nashville. Among the most tax-friendly metros for solopreneurs. Tennessee requires contractor licensing through the Board for Licensing Contractors for projects over $25,000. Nashville requires a business license.

Numbers reflect typical solo operators in the Nashville metro. Your situation will vary.

If You Need These — Nexa Has Them

Specific gaps Stamped Concrete run into with Jobber, and what Nexa does instead.

✗
Jobber gapPer-user fees add up quickly
✓
Nexa$279 once for your whole business — no per-user fees, ever.
✗
Jobber gapBasic plan missing key features
✓
NexaEverything in $279 — no tiers, no locked features.
✗
Jobber gapNo permit tracking or compliance docs
✓
NexaDocument attachment, permit tracking, customer notes.
"Jobber raised prices again and I was done. Found Nexa — $279 once. I own it. No more 'we're updating our pricing' emails. Best business decision this year."
— Stamped concrete contractor, switched from Jobber

Stop Losing $828/Year to Jobber

$2,778 over 3 years. Or $279 once (or 3 × $99). Own your tools.

Get Nexa — $279 Once
or 3 payments of $99
✓ 30-day money-back guarantee — save $500 or full refund

Still want Jobber?

We think Nexa is the better deal at $279 once vs $69/mo. But if you've decided on Jobber, here's the link. No hard feelings.

Jobber — $69/mo →

This is an affiliate link. If you sign up, we earn a commission.

Also Compare