You're Switching from Jobber.
Here's Why Paving Contractors Choose Nexa.

Jobber
$69/mo
$828/year — every year, forever
Nexa
$279
Once. Own it forever.
or 3 payments of $99
Break even in 4.0 months. Then it's free forever.
"Switched from Jobber after the last price increase. Nexa does everything I needed for $279. Wish I'd done it sooner."
— Verified paving contractor, former Jobber customer

The Bottom Line

Paving Contractors on Jobber pay $69/month — $828/year. Over three years, that's $2,778. Nexa is $279 once. Break-even runs about 4.0 months. The median paving contractor earns $50,000/year, so Jobber's annual cost is roughly 1.7% of typical revenue — every year, forever.

Key Numbers

$50,000
Median paving contractor income
2%
Typical SaaS spend as % of revenue
4.0 mo
Break-even vs Jobber
$2,499
3-year savings switching to Nexa

What Jobber Is Costing You

The Damage

Jobber monthly $69/mo
Annual drain $828/yr
Year 2 (11.4% SaaS inflation) $922
Year 3 $1,028
3-year total $2,778

That's $2,778 gone. And you don't own anything. Stop paying, lose access.

Your Jobber subscription has cost you $0.00 since you opened this page.

Why Paving Contractors Leave Jobber

Per-user pricing scales expensively ($29/user/month)
Marketing Suite is extra $79/month on lower tiers
Job costing only on Grow plan
Expense tracking locked to higher tiers
Real cost often $300-600/month for small teams
I recently canceled two subscriptions. HouseCall Pro is far superior. This company held me hostage for $8,250 for seven days claiming it was my first
Jobber is an overengineered platform that still lacks basic functionality. Confirmation emails cannot include a clear list of services being provided.
Their pricing could use some help. Features locked to higher tier should be included as default.
Paving Contractors are leaving Jobber every week.

You're not the only one who's had enough.

Why This Matters for Paving Contractors

You're paving a residential driveway today — 1,500 sq ft at $5/sq ft ($7,500). Materials: $2,800 for asphalt and base. Equipment rental: $400 for the day. You have a helper at $200/day. After materials and labor, profit should be $4,100 for a 10-hour day. But asphalt prices went up $5/ton since you quoted this job. Next week's sealcoating route has 8 driveways if the weather holds. Your quoting is a calculator app and job tracking is a text thread with your helper.

Paving Contractors face unique challenges: Material costs (asphalt, gravel, concrete) fluctuate with oil prices. Weather delays push schedules out and overlap jobs. Large job deposits tie up cash between mobilization and completion. Sealcoating season is short and weather-dependent. On top of all that, Jobber charges $69/month ($828/year) — money that comes directly from your revenue. The median paving contractor earns $50,000/year. Software at $828/year is a meaningful percentage of that income, every year, forever. And you do not own anything.

Your Asphalt and concrete equipment is yours. You bought it once. Nexa works the same way — $279 once for invoicing, scheduling, CRM, time tracking, and full accounting. All connected. All offline-capable. You own it like you own your tools.

Your Full Stack Cost

Jobber is just one piece. What else are you losing money on?

Want this breakdown emailed to you?

Your exact Jobber cost, full stack total, and what switching saves. 10 seconds.

"I was paying Jobber $69/month and didn't question it until I did the math. $2,778 over 3 years for tools I don't even own. Nexa was $279. Once. Done."
— Paving contractor business owner

What You Get Instead

Feature Jobber Nexa
Invoicing
Scheduling
CRM
Time Tracking
Full Accounting ✓ (SIMPL)
Task Management
Price $69/mo forever $279 once
or 3 × $99
3-Year Cost $2,778 $279
Stop paying? Lose everything Keep everything forever

Switching Takes 1-2 Days

Most paving contractors are fully switched before the weekend.

1

Export your data

Go to Settings → Data Export. Download clients, jobs, and invoices as CSV.

2

Set up Nexa

15-minute setup. Import your client list and job categories.

3

Parallel run

Run both for 1-2 weeks to verify scheduled jobs transfer cleanly.

4

Cancel Jobber

Cancel subscription before your next billing cycle. Download final export.

✓ Run both in parallel. Cancel Jobber when you're confident. Zero risk.

What paving contractors actually deal with

A day in the life of a paving contractor

You're paving a residential driveway today — 1,500 sq ft at $5/sq ft ($7,500). Materials: $2,800 for asphalt and base. Equipment rental: $400 for the day. You have a helper at $200/day. After materials and labor, profit should be $4,100 for a 10-hour day. But asphalt prices went up $5/ton since you quoted this job. Next week's sealcoating route has 8 driveways if the weather holds. Your quoting is a calculator app and job tracking is a text thread with your helper.

The tools a working paving contractor actually owns

Why paving contractors leave the big platforms

Where paving contractors actually talk shop

Local paving contractors on Nexa

Real paving contractors near you who run their business on Nexa — book directly, no platform fee. Are you a paving contractor? Post your business and get found in your area — $2.99 one-time. Or browse every paving contractor on Nexa →

FAQ

Is Nexa really a Jobber replacement for paving contractors?

For solo operators and small teams (1-5), yes. Nexa includes invoicing, scheduling, CRM, time tracking, task management, and full accounting. Jobber may be better if you have a large team (10+) or need enterprise-specific features.

$279 seems like a lot.

It's $7.75/month over 3 years. Jobber is $69/month — that's $2,778 over 3 years. Which is more? And if you'd rather split it, Nexa is also available as 3 payments of $99.

Can I pay in installments?

Yes. Nexa is $279 as a one-time payment, or 3 payments of $99 ($297 total). Either way it's a one-time purchase — no subscription, no recurring fees ever.

What if I don't like it?

30-day money-back guarantee. Full refund. If Nexa doesn't save you $500 in year one, you get every penny back.

Can I import my Jobber data?

Export your data from Jobber as CSV, import into Nexa in about 5 minutes.

Paving Contractors in Allentown

The average solo operator there spends about $2,352/year on software — and paving contractor face their own version of that math. PA state licensing requirements apply.

Numbers reflect typical solo operators in the Allentown metro. Your situation will vary.

If You Need These — Nexa Has Them

Specific gaps Paving Contractors run into with Jobber, and what Nexa does instead.

Jobber gapPer-user fees add up quickly
Nexa$279 once for your whole business — no per-user fees, ever.
Jobber gapBasic plan missing key features
NexaEverything in $279 — no tiers, no locked features.
Jobber gapNo permit tracking or compliance docs
NexaDocument attachment, permit tracking, customer notes.

Where Paving Contractors Talk Shop

If you want to compare notes or see how other paving contractors are running their tools, here's where the conversation happens.

Reddit
r/Paving, r/Construction, r/Concrete
Forums
PavementInteractive.org Forum
YouTube
Paving Business Tips
"Jobber raised prices again and I was done. Found Nexa — $279 once. I own it. No more 'we're updating our pricing' emails. Best business decision this year."
— Paving contractor, switched from Jobber

Stop Losing $828/Year to Jobber

$2,778 over 3 years. Or $279 once (or 3 × $99). Own your tools.

Get Nexa — $279 Once
or 3 payments of $99
✓ 30-day money-back guarantee — save $500 or full refund

Still want Jobber?

We think Nexa is the better deal at $279 once vs $69/mo. But if you've decided on Jobber, here's the link. No hard feelings.

Jobber — $69/mo →

This is an affiliate link. If you sign up, we earn a commission.

Also Compare